S-00 / Services 05 scopes

Roofers in Austin TX / what we sell

Roof replacement, metal, emergency and commercial roofing in Austin, each priced on a written scope.

Five services, one rule: nobody gets a number until someone has been on the roof. Below, each service has its own photograph, the spec we build to, what the price is based on, and what it does not include.

S-01 / Replacement
Roofer nailing architectural shingles along a chalk line over synthetic underlayment
Fig. 01 / Nailing on a chalk lineSynthetic underlayment below

Roof replacement in Austin, torn off to the deck.

Asphalt shingle is still what most Austin houses wear, and most of them get replaced at 15 to 22 years because the Texas sun bakes the asphalt brittle long before the label age.

We strip everything to bare OSB or plank. Every sheet that gives underfoot, shows black staining or has delaminated edges is cut out and replaced with new 7/16-inch sheathing, and counted. Then drip edge on every eave and rake, self-adhered ice-and-water membrane in the valleys and around every penetration, synthetic underlayment across the field, starter strip, and architectural shingles such as GAF or Owens Corning lines nailed to the manufacturer's pattern. Step flashing at sidewalls is new. Pipe boots are new. Ridge vent goes on only after we have measured soffit intake, because exhaust without intake just pulls conditioned air out of your attic.

Price basis Per roofing square (100 sq ft) plus decking per sheet replaced, written after a roof walk.

What moves the figure: total squares, pitch (anything steeper than 8/12 needs harnesses and slows the crew), number of stories, how many layers come off, how many sheets of decking turn out soft, and how much wall and chimney flashing there is. You see each of those as its own line.

Spec R-01 / Asphalt shingle replacement
ComponentWhat we fitNote
Deck7/16 in OSB replacement sheetsCounted, photographed
EdgeNew metal drip edge, eaves and rakesNever reused
ValleysSelf-adhered ice-and-water membraneAlso at pipes, chimneys
FieldSynthetic underlaymentLapped to spec
ShingleArchitectural, e.g. GAF or Owens Corning linesColor named on estimate
FlashingNew step, counter and pipe bootsNever reused
VentRidge vent sized to measured intakeIntake fix quoted separately

Outside a shingle replacement: overlays, framing, gutters

  • Overlays. We will not shingle over an existing roof.
  • Rafter or truss repair. If framing is damaged we photograph it and you bring in a carpenter or we quote it as a separate line.
  • Gutter replacement, unless you ask for it in writing.
  • A figure before anyone has walked the roof.
S-02 / Metal
Crew member seaming a galvalume standing seam metal roof panel
Fig. 02 / Hand seaming galvalume24-gauge panel

Standing seam metal roof installation for owners staying put.

Standing seam metal makes sense if you plan to own the house for 20 years or more, or if you want a roof that throws back more of the August sun than dark shingle does.

Our metal roof installation in Austin uses 24-gauge concealed-fastener panels. The clips sit under the seam, so there are no exposed screws with rubber washers that dry out, back out and leak after a few summers of expansion and contraction. Under the panels goes a high-temperature underlayment rated for the heat that builds under metal, not the standard synthetic used under shingles. Trim is where metal roofs are won or lost: eave, rake, ridge, sidewall, headwall, valley. Each piece is bent to the roof, and every one is counted on the estimate.

Price basis Per square by panel profile, gauge and trim count, written estimate.

A simple gable with two rakes and a ridge is cheap to trim. A cut-up hip roof with dormers, valleys and a chimney can double the trim count, and that shows up in the price. Panel color and finish are chosen before ordering; lead time on panels is set by the supplier and we tell you the date when we order.

Spec M-02 / Standing seam metal
ComponentWhat we fitNote
Panel24-gauge, concealed fastenerNo exposed screws
UnderlayHigh-temperature underlaymentFull coverage
FixingClips under the seamAllows thermal movement
TrimEave, rake, ridge, wall and valley piecesCounted per piece
DeckSoft sheets replaced as on shingle jobsPer sheet

Metal work we don't do on houses

  • Exposed-fastener "R-panel" on houses. We fit it on sheds and barns only, by request.
  • Metal over existing shingles. Tear-off first, same as any roof.
  • Solar mounting. Coordinate with your solar installer; we leave the seams clean for clamp-on mounts.
S-03 / Emergency Call 512-4586-800
Roofers battening down an emergency tarp over storm damage on a wet shingle roof
Fig. 03 / Tarp battened at duskTemporary only

Emergency roof repair: stop the water tonight, scope it when dry.

A tarp tonight. A written scope when it's dry.

When water is coming through a ceiling, the job is to stop it, not to sell a roof. Our emergency roof repair in Austin starts with a heavy tarp battened down with wood strips and screwed through the battens into the deck, or a temporary patch if the hole is small: a lifted shingle, a blown pipe boot, a punctured valley. The tarp runs up and over the ridge where it can, so water sheds over it instead of under it. Before anything is covered, we photograph the damage from the roof, because your insurer will want to see what it looked like before we touched it.

Once the roof is dry we come back, walk it properly and write a permanent scope. That might be a small job like resealing one boot, or it might be a section replacement. You decide with the paper in your hand, in daylight. For a roof leak repair that is not an emergency, the same scope process applies without the tarp.

Price basis Temporary work billed as call-out plus materials; permanent repair scoped separately in writing.
Spec E-03 / Emergency response
StageWhat happensBilled as
CallAddress, where water is showing, roof type if knownNo charge
PhotosDamage recorded before it is coveredPart of call-out
TarpHeavy tarp, wood battens, fastened through to deckCall-out plus materials
PatchBoot, shingle or valley sealed where small enoughCall-out plus materials
ScopeReturn visit when dry, written permanent repairSeparate written estimate

What a leak call won't involve

  • Signing a replacement contract on the night of the storm.
  • Interior water cleanup, drywall or mold work. Call a restoration company for those.
  • Any promise about what your insurer will pay.
Leaking now: call 512-4586-800
S-04 / Commercial
Roofer hot-air welding a white TPO membrane seam on a flat commercial roof
Fig. 04 / Hot-air weld on TPOWhite membrane, low slope

Commercial roofing in Austin TX, on TPO with welded seams.

Flat roofs leak at the edges and the penetrations, rarely in the middle of the field.

On low-slope commercial roofs we install and repair TPO roofing: white single-ply membrane, commonly 60-mil, over insulation board, with seams hot-air welded rather than glued or taped. A welded seam becomes one sheet. We probe every seam after it cools. Most of the labor on a TPO roof in Austin goes where the leaks actually start: parapet walls, edge metal, curbs around HVAC units, drains, scuppers and every pipe that comes through the deck. Each one gets its own detail, pre-formed or field-fabricated from membrane.

Flat roof repair cost depends on what we find. A split seam or a failed pipe boot is a small, fast repair. A wet insulation layer under the membrane is not, and we core-sample before quoting a re-cover so nobody seals water into the roof.

Price basis Per square by membrane thickness, insulation and edge detail, written estimate.
Spec C-04 / TPO low-slope roof
ComponentWhat we fitNote
MembraneTPO, thickness to spec, e.g. 60-milWhite
SeamsHot-air welded, probed after coolingNo tape seams
InsulationBoard stock to the specified thicknessWet board replaced
EdgesEdge metal, parapet flashing, scuppersDetailed per run
PenetrationsCurbs, drains, pipes, HVAC standsCounted per item

Left to other trades on a flat roof

  • Spray coatings sold as a roof replacement over a wet substrate.
  • HVAC disconnects and reconnects. Your mechanical contractor handles those.
  • Structural repair to joists or steel deck.
S-05 / Inspection
Hail hits circled in chalk on asphalt shingles during a roof inspection
Fig. 05 / Hits chalked and measuredTape for scale

Hail damage and storm roof inspection, hit by hit.

Hail bruises rarely show from the driveway. A real roof inspection in Austin means walking every slope.

After a hail storm we walk the roof slope by slope, chalk-circle every hit, lay a tape across it for scale and photograph it. Soft metals like vents and gutters get checked too, because dents there help show the hail size. Then we write it up: which slopes took hits, how many per test square, what is real bruising with granule loss and a soft mat underneath, and what is blistering, foot traffic or plain age. That last part matters. A report that calls everything hail damage helps nobody once an adjuster looks.

If the report shows hail damage roof repair or replacement is warranted, the estimate follows as a separate document. If it doesn't, you have a dated record of your roof's condition.

Price basis Booked as its own visit; written report supplied.
Spec H-05 / Written inspection report
SectionContents
SlopesEach slope listed with direction and hit count
PhotosEvery chalked hit with tape for scale
Soft metalsVents, flashing and gutters checked for dents
WearBlistering, granule loss and age separated from storm damage
InteriorAttic decking and staining, where access allows

What a hail inspection from us is not

  • Filing your claim or acting as your public adjuster.
  • Calling wear "hail" to get a claim through.
  • Inspections from a drone or the ground only.
S-06 / Who this suits

Before you book

Who we are a good fit for, and who should call someone else.

Good fit: homeowners who want to know what's under their shingles before they pay, and property managers who need a flat roof fixed at the edges rather than coated over. Anyone with water coming in tonight gets a tarp without signing anything.

Not a fit: if you want the lowest number in town and are happy with an overlay, we will lose that bid. If you need a guarantee that your insurer pays, nobody honest can give it. And if you want a firm price over the phone from a satellite image, we will ask to come out first.

The process from first call to finished roof is laid out on the home page. How the crew works and what it refuses is on the about page.

S-07 / Book

Someone walks your roof before anyone writes a number.

Tell us the address and the job. We call back to set a time, walk the roof and send a written, itemized estimate.