A-01 / Statement Austin, Texas 78727
Roofers in Austin TX Residential Commercial Emergency leaks

Austin roofing company for roof replacement, emergency roof repair and commercial roofs.

Every estimate is written layer by layer: tear-off, decking per sheet, underlayment, shingle or panel, flashing, vents, haul-off. You read what each line covers before you sign, and nobody quotes your roof from the street. The crews go out from our yard at 12131 Pecan St, and when you call 512-4586-800 you reach the people who schedule them, not a lead broker.

  • Itemized by layerDecking counted per sheet
  • Flashing replacedStep and counter, never reused
  • No overlaysTear-off to the deck, every job
  • Leak firstTarp tonight, written scope when dry
A-02 / Offer 05 lines

What we fit and fix

Five kinds of roof work, each priced on what it actually involves.

Roof replacement in Austin is mostly asphalt shingle, but a good share of our calls are metal, low-slope commercial roofs and storm damage. The price basis sits next to each line. A figure only comes after someone has walked your roof.

Inquiry only. No figure on this site is a binding quote.

Full scope, exclusions and spec per service
A-03 / Proof Under the shingles
Roofers stripping old asphalt shingles down to the OSB decking on an Austin house
Newly replaced charcoal architectural shingle roof on a limestone house in Austin

Layer stackDeck up

  1. Decking, soft sheets replaced
  2. Drip edge at eaves
  3. Ice-and-water at valleys
  4. Synthetic underlayment
  5. Starter strip
  6. Architectural shingle
  7. Step flashing, new
  8. Ridge vent and cap

Tear-off on day one, ridge cap on day two. Two jobs, one method.

What a re-roof covers

Most bad roofs fail under the shingles, not on top of them.

We pull every sheet of soft decking we find. You see the count on the invoice, not a surprise.

A roof replacement in Austin should mean the old roof comes off to bare OSB, someone walks the deck sheet by sheet, and anything that flexes under a boot or shows black water staining gets cut out and replaced with new 7/16-inch sheathing. That count goes on the estimate as a per-sheet line before the job starts, so the number only moves if the deck is worse than we could see, and then you get photos.

These are the failures we find most when we open up a roof another crew did:

  • Soft OSB left in place

    Shingles nailed into decking that has already delaminated. Nails lose hold and the next storm lifts tabs.

  • Step flashing reused

    Step flashing gets replaced. Reusing it saves forty minutes and costs you a ceiling.

  • Exhaust with no intake

    A ridge vent over blocked soffits does nothing. We check intake against exhaust before ventilation is quoted.

  • Overlay on an old roof

    No overlays. Two layers of shingles trap heat and hide a rotten deck.

  • Missing drip edge

    Water wicks back under the first course and rots the fascia. New drip edge goes on every eave and rake.

Hail bruises don't always show from the ground. We walk the roof and photograph each one.

A-04 / Process 07 steps

How a replacement runs

From the first roof walk to the magnet sweep, in seven steps.

A typical single-story Austin home is torn off and dried in on day one and finished on day two. Steep pitches and a lot of rotten decking stretch that, and you hear about it before the crew arrives.

  1. 01 Day 0 / On site

    Inspection on the roof

    Someone climbs up. We check the deck for give, count layers, look at every penetration and measure intake at the soffits against exhaust at the ridge. Attic access if you have it.

    Takes 45 to 90 min

  2. 02 Day 1 to 3 / Paper

    Written scope, itemized

    Squares, expected decking sheets, underlayment, shingle line and color, flashing, vents and haul-off, each on its own line. Questions answered before anything is signed.

    Output written estimate

  3. 03 Day before / Yard

    Material delivery

    Bundles, underlayment rolls, drip edge and flashing coil land on the driveway or roof-loaded. We confirm the shingle color against your signed sheet on delivery, not after it is nailed.

    Checked against the estimate

  4. 04 Day 1 / Morning

    Tear-off to the deck

    Old shingles, felt and nails come off into a dumpster or trailer. Tarps cover landscaping and the AC unit. Only as much roof is opened as can be dried in that same day.

    Rule never open what can't close

  5. 05 Day 1 / Afternoon

    Deck repair and dry-in

    Soft sheets cut out and replaced, counted and photographed. Drip edge on, ice-and-water in the valleys and around pipes, synthetic underlayment over the field. The house is weather-tight by evening.

    Logged sheets replaced, with photos

  6. 06 Day 2 / Full day

    Install and flash

    Starter, shingles on a chalk line at the manufacturer's nailing pattern, new step and counter flashing at walls and chimneys, new pipe boots, ridge vent and cap.

    Fastening to the manufacturer's schedule

  7. 07 Day 2 / Close

    Cleanup and walk-through

    Magnet sweep on the lawn, beds and driveway, gutters cleared of granules. Then we walk the job with you, show the decking photos and hand over the paperwork.

    Handed over photos and warranty papers

01 / 07

Drag, scroll or use the arrow keys

A-05 / Spec Estimate lines

Roof replacement estimate

What a standard shingle replacement estimate itemizes, line by line.

This is the skeleton of every roof replacement estimate we write in Austin. Your roof adds or drops lines: a chimney adds counter flashing, a skylight adds a kit, a second layer of old shingles adds tear-off labor.

Standard asphalt shingle replacement / estimate lines
CodeLayerWhat goes onUnit on estimate
L-01Tear-offAll existing shingles, felt and nails stripped to bare deck. Extra layers charged separately and named.Per square, per layer
L-02DeckingSoft, delaminated or water-stained OSB or plank cut out and replaced with new 7/16 in sheathing. Each sheet photographed.Per 4 x 8 ft sheet
L-03Drip edgeNew metal drip edge at every eave and rake. Old edge is never reused.Per linear foot
L-04Ice-and-waterSelf-adhered membrane in valleys and around pipes, vents and chimneys.Per roll / area
L-05UnderlaymentSynthetic underlayment over the remaining field, lapped and fastened to spec.Per square
L-06ShingleArchitectural shingle such as GAF or Owens Corning lines, color named on the estimate, starter strip at eaves.Per square
L-07FlashingNew step flashing at sidewalls, counter flashing at chimneys, new pipe boots.Per item / linear foot
L-08VentilationRidge vent or box vents sized against measured soffit intake. Intake fixes quoted as their own line.Per linear foot / unit
L-09Ridge capMatching hip and ridge cap shingles.Per linear foot
L-10Haul-offDumpster or trailer, disposal, magnet sweep of lawn, beds and driveway.Per job

Table describes how an estimate is built. It is not a price list and no line here is a binding quote.

A-06 / Questions

Before you call

Straight answers to what homeowners ask first.

If you want the cheapest number in town and an overlay will do, we are not your roofer. If you want to know what is under your shingles, keep reading.

Can you quote my roof from photos or a drone?

Not for a full replacement. Photos show granule loss and missing tabs. They do not show a deck that flexes under a boot or rot around a pipe. We will look at your photos to decide how urgent a visit is, then we come out and walk it.

Will my insurance pay for the new roof?

That is your insurer's decision, and nobody honest can promise it. What we supply is a written inspection report with hit-by-hit photographs, separating hail and wind damage from ordinary wear, so your adjuster has something specific to look at.

Why won't you lay new shingles over the old ones?

Because the second layer cooks in Texas sun, shortens shingle life, adds weight to the framing and hides whatever is wrong with the deck. Some manufacturers also restrict warranty coverage on overlays. Every roof we replace gets torn off.

It's raining and water is coming through the ceiling. What now?

Call 512-4586-800. We tarp or patch to stop the water, photograph the damage, and come back with a written permanent scope once it is dry. Nobody signs a replacement contract on a wet night with us.

Do you do flat and commercial roofs?

Yes. Low-slope roofs in TPO with hot-air welded seams, plus repairs at edges and penetrations on existing membranes. See commercial and flat roofing for what that scope includes.

A-07 / Contact Inspection or leak

Book a roof inspection

Tell us the address and what you're seeing. We'll come and walk the roof.

For a roof inspection in Austin, a replacement estimate or a roof leak repair, use the form or call. Active water coming in? Call rather than type; a form waits in a queue, the phone doesn't.

Inquiry only. A person reads this and calls you back.